We deliver on time high quality projects that meet our client’s needs
Projects
OUR PROJECTS

MALL OF DILMUNIA
Read more

DIYAR AL MUHARRAQ PROJECT HABITAT, PRIORITY PLOT 23A.2
The work comprises the construction of ..
Read more
Distribution Networks, Pumping Stations & Water Tanks Zone A Of Beirut
The works consists of water supply systems including pipes, fittings and accessories, water tanks, pumping stations, electrical works, geotechnical works…
Read more


IMMEUBLE SIEGE ECOBANK
The works comprise the construction of offices: 1 basement, 1 ground floor and 6 levels, 7,200 m² built up area.
Read more
OLIVAR BRASILIA
Project consists of 30 apartments spread over 3 modern buildings comprising of 3 basements and 4 floors.
Read more
MARINA & YACHT CLUB
Read more
MINISTERE DES MINES ET DE LA GEOLOGIE (BECC)
The works comprise the construction of the Ministry offices: 1 ground floor and 4 levels, 4,900 m² built up area.
Read more
USINE D’EMBOUTEILLAGE HUILE DE PALME ET PRODUCTION MARGARINE
Construction of Modern Hangar Metallic Structure (Size 90 X 75 m H = 14m).
Read more
MONDELEZ BISCUIT FACTORY AT BIIP – HIDD
Construction of Production Plant Building, Administration & Canteen Building..
Read more
USINE DE PRODUCTION PHARMACEUTIQUE
The factory is composed of 1 ground floor and 2 levels Built up area: 5,400m²
Read more
VILLA KINTELE
Villa composed of 2 underground levels, 1 ground floor and 1 level, with a swimming pool. Built up area: 2,450m²
Read more
GCC INTERCONNECTION – ELECTRICAL SUBSTATIONS IN BAHRAIN & QATAR
Design & build of 2 electrical sub-station of 400 KV in Bahrain (Al Jasra) and Qatar (Doha South)
Read more

RIFFA VIEWS
The works briefly comprises of construction and completion of infrastructure works including .
Read more
Evangelical School – Ras Maska
Part 1: consists in the concrete, waterproofing works pertaining to buildings A, B, C and the “House”......
Read more
ASSURANCE GENERALE DU CONGO
Construction of the Insurance Headquarter in Brazzaville consisting of 2 undergrounds, 1 ground floor and 14 levels.....
Read more
QATAR EMBASSY & AMBASSADOR’S RESIDENCE BUILDING IN BEIRUT
The works comprise the construction of Qatar Embassy and the.....
Read more

HOTEL AZUR
Construction, Extension and refurbishment. The hotel is composed of 1 ground floor & 4 levels.
Read more
EXTENSION HOTEL OLYMPIC PALACE
Construction of a new building of 6 floors, 30 rooms and 4 presidential suites.
Read more
REHABILITATION OF THE CHAMBER OF COMMERCE, INDUSTRY & AGRICULTURE OF BEIRUT & MOUNT LEBANON
Rehabilitation of existing building: supply, installation, testing, commissioning, warranty & mobilization.
Read more
ORDER OF ENGINEERS & ARCHITECTS – TRIPOLI
Execution & Completion of structural, infrastructural (mechanical & electrical) and isolation works. The building is composed from offices & conference hall.
Read more
ELLIPSE CENTER
Project consists of a mixed use office commercial building of about 18,763 sq.m and comprising offices ...
Read more
SAIFI RESIDENCES – LOT 146 SAIFI
Construction of 4 residential buildings: typical floors, duplex, basements for parking’s, underground for technical & shop storage ground floor for shops and cafes.
Read more
AGENCE DE REGULATION DES POSTES ET TELECOMMUNICATIONS ELECTRONIQUES
Construction of the Headquarter building of the Agency in Brazzaville....
Read more
NACIM BAABDAT PLOT No. 220 MARMOUSA
Construction of 16 luxurious villas (Electrical works, plumbing, sanitary, heating, air conditioning).
Read more
COCO BEACH HOTEL
Construction and refurbishment (5000m²) supply of furniture and equipment...
Read more
MILITARY CLUB – DEIR AMMAR
Construction of a military club composed of sporting club (pools, cabinets, snack bar,….) ....
Read more
AIN ADHARI NATIONAL PARK
Works includes all civil, electro-Mechanical & finishing works for the main building complex ....
Read more
GULF AIR SIMULATOR TRAINING CENTER IN MUHARRAQ
Simulator training center building for Pilot, MEP & Civil works and all related facilities for Gulf Air.
Read more
TRIPOLI PUBLIC HOSPITAL
Read more
TABET HEAD OFFICE
Read more
ROAD REHABILITATION / RN4 KISANGANI – NIANIA
Rehabilitation of 341 km, 20 culvert & 7 bridges.
Read more



BOUANZA – MOUYOUNDI ROAD
Construction of Bouanza – Mouyoundi road (43Km – 4 reinforced concrete bridges).
Read more
DAMS OF N’ZI VALLEY
Construction of two earth dams and irrigation planning of 400 Ha. Length: 1,200m and 900m, Height: 9m
Read more